|
|
|
SURFACE PREPARATION

- Using UHP Water Jetting 30,000 P.S.I. to 40,000 P.S.I. (using robotic tools where possible)
- Removal of coating from concrete, stucco, walkways, patios, on all buildings
- Removal of coatings from all ships, vessels, and mega yachts (steel and fiberglass)
- Removal of coatings from various tanks, ponds, walkways and steel structures at Disney and Sea World
- Profiling of concrete on various structures for over coating or overlaying of concrete
- Removal of coatings from various steel structures
- Removal of rubber lining from phosphoric acid tanks
NASA Shuttle Launch Pad (Repair Damaged Insulation)
|
NASA Shuttle Launch Pad (Repair Damaged Insulation)
|
Remove coatings form various vessels from 30’ long to 800’ long
|
Remove failing coatings from tilt wall building
|
Profiling of concrete to expose rebar and concrete
|
Profiling of concrete to expose rebar and concrete
|
Orlando Condo Profiling support beams ¼” profile (ICRI #7)
|
Orlando Condo Profiling support beams ¼” profile (ICRI #7)
|
JEA Power Plant Profiling Cooling Tower Legs
|
Bridge Columns Profiled to ¼” Profile (ICRI #7)
|
|
|